East Lake Project
This project is an addition to a cabin that we built originally in 1983, The addition is 40' x 28' and has a full basement and loft
![]() The basement is in and the floor is on 8/10/06
|
![]() This addition will have a 12' x 10' covered entry
|
![]() The original cabin had to be jacked up and a block wall built under the original footing. Then the basement walls where poured around it. |
|
Log work as of 8/27/06 |
8/28/26 |
9/22/06 |
|
9/22/06 |
10/15/06 Beginning Framed gable |
10/20/06 |
|
10/20/06 |
11/2/06 |
12/21/06 Start of the roof |
|
Finished front gable 12/21/06 |
The Dormer |
Completed 1st layer of roof 1/5/07 |
|
Installed and trimmed windows and doors |
Cabin viewed from the lake |
Lake view |
![]() Dormer on new addition |
Loft |
Loft Rail |
![]() New Dormer on existing cabin |
|
|
|
Completed Roof 6/28/07 |
|
|
|
|
|
|
|
Basement Bedroom 3/14/08 |
|
|
|
Sauna Shower |
Basement Bathroom |
|
|
Cedar Sauna |
|
Sauna Cedar Door |
|
|